Hardstanding Pre-Application Consultation (PAC)

You can download and view the draft application documents 
by clicking on the sections below. 

Manual
Covering letter
Hardstanding Pre-Application Consultation (PAC)

Covering Letter

Introduces the application that would be submitted.

Manual
Technical plans
Hardstanding Pre-Application Consultation (PAC)

Technical plans

Illustrating the site location, details of the existing site and proposed.

  • Site location
  • Existing site plan and section
  • Proposed site plan and section
Manual
Design and access statement
Hardstanding Pre-Application Consultation (PAC)

Design and access statement

Sets out the detailed design of the proposed development, and details of how it will be accessed. 

Manual
Flood risk and drainage report
Hardstanding Pre-Application Consultation (PAC)

Flood risk and drainage report

Reviews the proposed development to assess against the risk of flooding and demonstrates how this would be managed and sets out the strategy to manage surface water drainage on the proposed development site.

Manual
Green infrastructure statement
Hardstanding Pre-Application Consultation (PAC)

Green infrastructure statement 

Outlines the development’s response to green infrastructure.

Manual
Site investigation
Hardstanding Pre-Application Consultation (PAC)

Site investigation

Presenting the findings of a site investigation to assess physical, chemical, and environmental conditions for the proposals.

Manual
Ecology report
Hardstanding Pre-Application Consultation (PAC)

Ecology report

A detailed assessment of the ecological characteristics of a specific area to inform environmental decision-making.

Manual
Landscape strategy
Hardstanding Pre-Application Consultation (PAC)

Landscape strategy

Details the landscaping proposed as part of the development. 

EN-Corporate-Green Steel Future-Planning-Hardstanding

Contact us
We invite you to share any questions and feedback with us by using the contact methods below. The formal Pre-Application Consultation period will run from 19 July – 16 August.

Hardstanding planning and project information

Write to:

Hardstanding consultation
c/o Turley
18 Windsor Place,
Cardiff,
CF10 3BY